UDT01 Links Tab of the UDT09 Screen
Use the UDT01 Links tab of the UDT09 screen to add and/or delete UDT01 links. A table of currently linked items displays.
Note: The Direct Link or Wildcard subtasks display conditionally, depending on how link options are set on the UDT options tab of
. For example, if the UDT is configured as a direct link, the subtasks related to Wildcards do not display, or conversely, if configured as Wild Card, the Direct Links subtasks do not display.
The
New function will also perform differently, depending on the configuration setting for the type of link.
UDT01 Direct Links Subtask
Note: If your version of Time & Expense is co-deployed with Costpoint, the Direct Links subtask is read-only, because modifications must be applied directly to the appropriate area within Costpoint.
Field | Description |
---|---|
UDT01 |
This column displays the currently linked UDT01s. |
Description |
This column displays the currently linked UDT01 descriptions. |
UDT01 Wildcard Links Subtask
Field | Description |
---|---|
UDT09 |
This column displays the currently linked UDT09. |
UDT01 |
This column displays the currently linked wildcard UDT01. |
Parent Topic: UDT09S